Build Process

    Gunite Shell: Building Your Pool's Foundation

    The gunite phase creates the structural shell of your pool—a monolithic concrete structure reinforced with steel rebar, engineered to last 50+ years in Houston's soil conditions.

    Timeline: 1–2 days for application, 7–14 days curing

    Before gunite is applied, our steel team installs a carefully engineered rebar framework that reinforces the entire pool structure. Plumbing pipes and return fittings are positioned precisely. Then our certified gunite applicators use high-pressure pneumatic equipment to shoot concrete over the rebar cage, building up the shell to the engineered thickness. The finished shell is hand-troweled for smooth transitions and inspected before beginning the curing process.

    Steps in This Phase

    • Steel rebar framework installation
    • Plumbing and returns positioning
    • Gunite application by certified operators
    • Hand finishing and contouring
    • Shell inspection and quality check
    • Curing period (7–14 days)
    • Tile and coping preparation

    Frequently Asked Questions

    Ready to Start Your Pool Project?

    Schedule your free 3D design consultation and see your dream pool before we build.